This project was started late in 2012 and has been slowly come alone, hopefully it all will installed in the car this year
Engine was pulled apart to check for wear.
The flywheel was lightened, a set of forged rods purchased and the block was shimmed.
The K24 turbo was bolted on so a rear engine mount could be made for the M66 box.
Got hold of a RN crank out of a later engine and had a alloy front pulley made.
Had to make up custom gear linkage to fit to the M66 box so the 850 link rods would fit the box
And now the good bit, reassembling the engine.